Skip to main content
OneInspect

Building inspection software your inspectors can carry into the field

OneInspect keeps each inspection with the permit or place it belongs to, carries the checklist your city sets for that type, and lets the result move the work along instead of sitting in a file.

These demos show the feel of Zanevan One. Each module is fully customized to the workflows of the department that uses it, within your organization. How implementation works

Building and field inspections

What inspectors and the permit office do with it

  1. Take a request.

    A contractor asks for an inspection. Staff pick the permit, and the type, address and point come from it.

  2. Plan the day.

    Each inspector sees their inspections by date, as a list and on a map, and can move one to another day or another inspector.

  3. Inspect on a phone or tablet.

    Mark each checklist item Pass, Fail or Not Applicable, write what you saw, and take photos. A failed item carries its own evidence.

  4. Record the result.

    Passed, Failed or Not Ready. The result goes onto the permit's history with who recorded it and when.

  5. Send out the correction and set the re-inspection.

    A failed inspection can create the re-inspection, with the same checklist, linked to the one that failed.

  6. Move the permit on.

    A passed final inspection can move the permit to the stage you name, and print what follows, such as a certificate of occupancy, from the permit's printed layouts.

Other inspections use the same engine.

Fire prevention inspections by occupancy risk, playground checks and sign inspections are their own inspection types, with their own checklists, in the same module. They come from a due list rather than a permit.

Built on ArcGIS

Your records stay in your ArcGIS Online.

Inspections are a point layer with photos attached, a checklist table that holds each item as asked with its result and comment, a history table and a table for your own questions, in your own ArcGIS Online organization. Because each checklist item is its own row, a report such as which items fail most is one question, not a spreadsheet exercise.

Zanevan One is built on ArcGIS, and the records are feature layers in your own organization, not in a Zanevan database. Who owns our data?

Your settings, not code

  • Inspection types
  • Checklist items and the code sections they cite
  • Which permit types call for which inspections
  • Stages
  • Who may perform each type
  • Report and notice wording

FAQ

Questions about OneInspect

More in questions cities ask.

Can we use our own checklists?

Yes. Each inspection type has the checklist items your city sets, optionally with the code section each one cites. Adding an item is a setting, not a change to the layer.

What happens when an inspection fails?

The result and the failed items are recorded with photos, a correction notice can be printed, and the re-inspection can be created carrying the same checklist and a link to the one that failed.

Does a passed inspection change the permit by itself?

Only if your city sets that rule. If the permit is no longer in a stage that allows the move, nothing is moved and the inspection's page says why. Taking back a result does not silently undo what it set off; the screen tells you what to move back by hand.

Talk to us

Tell us how your departments work today.

We will walk through it with you and show how OneInspect would be shaped to the way your city works.